Aug 7, 2018 | Project Experience
Wilcox assisted a grey iron foundry with the preparation of environmental permits, annual compliance documents, stack testing, and industrial hygiene sampling and analysis. Additionally, we managed and directed the closure of an on-site LUST issue achieving an IDEM No...
Aug 7, 2018 | Project Experience
Wilcox assisted hospitals in the Indianapolis and Bloomington, Indiana area with the preparation of various environmental permits and annual compliance documents. Additionally, we have performed numerous Indoor Air Quality (IAQ) investigations throughout the...
Aug 7, 2018 | Project Experience
Wilcox assisted this client with the preparation of environmental permits and annual compliance documents, including: air permits, storm water and wastewater discharge permits, SPCC and Storm Water Pollution Prevention Plan, Tier II and Form Reports and Biennial Waste...
Aug 7, 2018 | Project Experience
Wilcox negotiated with IDEM on behalf of the client to move towards the completion of its post-closure requirements. In so doing, we generated a Sampling and Analysis Plan, a Methane Monitoring Plan, and a Statistical Evaluation Plan.
Aug 7, 2018 | Project Experience
Wilcox prepared a solid waste processing permit application for this facility and successfully ushered the application through the regulatory process to permit issuance. This is one of a very small number of such permits issued in the state, and is believed to have...
Aug 7, 2018 | Project Experience
Wilcox performed soil and groundwater remediation at this VRP site in north-central Indiana. The manufacturing facility site comprises a 27-acre project area within a larger industrial property. Contaminants identified at the site are chlorinated solvent constituents...