Aug 7, 2018 | Project Experience
Wilcox assisted in a large acquisition of multiple gasoline convenience stations throughout the Midwest. Not only were traditional Phase I activities performed, but also streamlined site by site evaluations, documenting the environmental fate of each individual...
Aug 7, 2018 | Project Experience
Wilcox assisted a grey iron foundry with the preparation of environmental permits, annual compliance documents, stack testing, and industrial hygiene sampling and analysis. Additionally, we managed and directed the closure of an on-site LUST issue achieving an IDEM No...
Aug 7, 2018 | Project Experience
Wilcox assisted hospitals in the Indianapolis and Bloomington, Indiana area with the preparation of various environmental permits and annual compliance documents. Additionally, we have performed numerous Indoor Air Quality (IAQ) investigations throughout the...
Aug 7, 2018 | Project Experience
Wilcox assisted this client with the preparation of environmental permits and annual compliance documents, including: air permits, storm water and wastewater discharge permits, SPCC and Storm Water Pollution Prevention Plan, Tier II and Form Reports and Biennial Waste...
Aug 7, 2018 | Project Experience
Wilcox negotiated with IDEM on behalf of the client to move towards the completion of its post-closure requirements. In so doing, we generated a Sampling and Analysis Plan, a Methane Monitoring Plan, and a Statistical Evaluation Plan.